Search: 00, Facilities Services, 2018

Results 1 - 10 of 12

Results

Sustainability

In order to protect the health, wellness, and learning potential of all our students and staff, ¾«Æ·SMÔÚÏßӰƬ is thinking deeply about how to both adapt to a rapidly changing climate, as well as mitigate our impact on it. Our schools are becom ...

Overview - - 0 comments

Draft Mitigated Negative Declaration for the Central Kitchen Project

Draft MND for the Central Kitchen Project Technical Appendix for MND (Post, Facilities Se ...

Post - - 0 comments

Sutter Middle School’s HVAC

Project Info: Sutter Got a new condensing unit, furnace, ducts, controls, a new boiler and water heaters. (Funded By Bond Measure Q and Prop 39-Completed Summer of 2018). Project Status: Completed (Bond Project, Comp ...

Bond Project - - 0 comments

Susan B. Anthony Elementary School’s Roof

Project Info:  Susan B. Anthony roof were done, as well as their gutters. (Funded By Bond Measure Q-Completed Summer of 2018) Project Status: Completed Que ...

Bond Project - - 0 comments

Phoebe Hearst Elementary School’s Restroom Remodel

Project Info:  Phoebe Hearst Elementary got two staff restroom remodeled. They have new plumbing piping, toilets, sinks, mirrors, hand dryers, lights, epoxy flooring, paint, doors and signage. (Funded By Bond Measure Q-Completed S ...

Bond Project - - 0 comments

The Met Sacramento High School’s Roof Remodel

Project Info:  The Met Sacramento High School’s roof was removed down to plywood, and replaced with a new roof system. (Funded By Bond Measure Q-Completed Summer of 2018) Project Status: Completed ...

Bond Project - - 0 comments

O.W. Erlwine Elementary’s Curb Wall/Roof Remodel

Project Info:  The playground got a new seat wall built to enclose the play structure area, and provide additional seating for the kids while they are playing. (Funded By Bond Measure Q-Completed Summer of 2018) The roof w ...

Bond Project - - 0 comments

A.M. Winn K-8 School’s Asphalt

Project Info:  A.M. Winn’s asphalt was removed and replaced. (Funded By Bond Measure Q-Completed Summer of 2018) Project Status: Completed Questions Concerning ...

Bond Project - - 0 comments

Hiram Johnson High School’s New Field

Project Info:  Hiram Johnson playfield and track were replaced. Football, Soccer, and Track will be able to be played on the new field. (Funded By Bond Measure Q-Completed Summer of 2018) Project Status: C ...

Bond Project - - 0 comments

Woodbine Elementary School’s Plumbing

Project Info:  Woodbine Elementary boy’s restroom was remodeled with a new layout. (Funded By Bond Measure Q-Completed Summer of 2018) Project Status: Completed ...

Bond Project - - 0 comments