Search: 0, Construction Projects

Results 1 - 10 of 37

Results

Project Labor Agreement

Download (Pod, Construction Projects) ...

Pod - - 0 comments

Sutter Middle School’s HVAC

Project Info: Sutter Got a new condensing unit, furnace, ducts, controls, a new boiler and water heaters. (Funded By Bond Measure Q and Prop 39-Completed Summer of 2018). Project Status: Completed (Bond Project, Comp ...

Bond Project - - 0 comments

Susan B. Anthony Elementary School’s Roof

Project Info:  Susan B. Anthony roof were done, as well as their gutters. (Funded By Bond Measure Q-Completed Summer of 2018) Project Status: Completed Que ...

Bond Project - - 0 comments

Phoebe Hearst Elementary School’s Restroom Remodel

Project Info:  Phoebe Hearst Elementary got two staff restroom remodeled. They have new plumbing piping, toilets, sinks, mirrors, hand dryers, lights, epoxy flooring, paint, doors and signage. (Funded By Bond Measure Q-Completed S ...

Bond Project - - 0 comments

The Met Sacramento High School’s Roof Remodel

Project Info:  The Met Sacramento High School’s roof was removed down to plywood, and replaced with a new roof system. (Funded By Bond Measure Q-Completed Summer of 2018) Project Status: Completed ...

Bond Project - - 0 comments

O.W. Erlwine Elementary’s Curb Wall/Roof Remodel

Project Info:  The playground got a new seat wall built to enclose the play structure area, and provide additional seating for the kids while they are playing. (Funded By Bond Measure Q-Completed Summer of 2018) The roof w ...

Bond Project - - 0 comments

A.M. Winn K-8 School’s Asphalt

Project Info:  A.M. Winn’s asphalt was removed and replaced. (Funded By Bond Measure Q-Completed Summer of 2018) Project Status: Completed Questions Concerning ...

Bond Project - - 0 comments

Hiram Johnson High School’s New Field

Project Info:  Hiram Johnson playfield and track were replaced. Football, Soccer, and Track will be able to be played on the new field. (Funded By Bond Measure Q-Completed Summer of 2018) Project Status: C ...

Bond Project - - 0 comments

Woodbine Elementary School’s Plumbing

Project Info:  Woodbine Elementary boy’s restroom was remodeled with a new layout. (Funded By Bond Measure Q-Completed Summer of 2018) Project Status: Completed ...

Bond Project - - 0 comments

Ethel Philips Elementary School’s Restroom Remodel

Project Info:  Ethel Phillips got a restroom remodeled. (Funded By Bond Measure Q-Completed Summer of 2018) Project Status: Completed Questions Concerning ...

Bond Project - - 0 comments